Hold On To Your Hat – Channels…

Next up at King’s Hill Sound PDX was the installation of isolation hangers and “hat channel” to suspend the drywall from the studs.

We had a short pause while we changed over from electrical work to drywall, but things are back to full steam ahead.

Hold On To Your Hat-Channel…

The drywall phase started with the installation of isolation clips and hat channel to suspend the drywall from the studs.

Next up, the three layers of drywall will be going up with a layer of metallic paint all around and sheets of steel between the first two layers in the ceiling. More photos as things progress!

Related Posts

Hold On To Your Hat – Channels… (8/24/2018) - Next up at King’s Hill Sound PDX was the installation of isolation hangers and “hat channel” to suspend the drywall from the studs.
Tinfoil Hats & Warning Lights (7/23/2018) - King's Hill Sound - PDX Studio Update - electrical pre-wire, seismic retrofit, insulation and EMI abatement. Tinfoil Hats & Warning Lights.
King’s Hill Sound – Coming to PDX in 2019! (7/9/2018) - We are excited to share some details on the studio we are building in the City of Roses - Portland, OR. Designed by Wes Lachot, the studio will be located in SW Portland in the King's Hill neighborhood.